{
  "schema": "WESEARCH-STORY-PROVENANCE-V1",
  "storySlug": "data-centre-construction-stocks-lose-42tn-as-boom-in-ai-trad-12a40ec8",
  "originalPublisher": "International homepage",
  "canonicalUrl": "https://www.ft.com/content/d5adde7e-68cc-455b-ba78-b39cc3676b7a?syn-25a6b1a6=1",
  "wesearchUrl": "https://wesearch.press/s/data-centre-construction-stocks-lose-42tn-as-boom-in-ai-trad-12a40ec8",
  "publicationTime": "Sun, 15 Nov 2026 05:00:04 GMT",
  "retrievalTime": "2026-11-15T07:09:21.513Z",
  "lastSeenTime": "2026-11-15T07:09:21.513Z",
  "headline": {
    "displayed": "Data centre construction stocks lose $4.2tn as boom in AI trade unravels",
    "source": "publisher",
    "modifications": [
      "Displayed as received from the publisher feed or extract; WeSearch does not rewrite headlines."
    ]
  },
  "excerpt": {
    "present": true,
    "source": "publisher-description",
    "method": "Publisher-supplied description / RSS summary field.",
    "charLimit": 800
  },
  "summary": {
    "present": false,
    "producedBy": "none",
    "model": null,
    "sourceText": "description",
    "citationCoverage": "No WeSearch summary has been generated for this story yet."
  },
  "rights": {
    "sourceId": "ft-home",
    "feedTitle": "Financial Times — Home",
    "basis": "rss-default",
    "basisLabel": "Derived from the published RSS/Atom feed",
    "layers": {
      "publisher-declared": "No publisher-confirmed rights record for this source yet.",
      "machine-readable-detected": "No source-specific machine-readable restriction detected beyond the public feed.",
      "wesearch-interpretation": "WeSearch declared handling (basis: Derived from the published RSS/Atom feed). This is WeSearch policy, not a legal grant on the publisher's behalf.",
      "unknown": "Retrieval and training permissions are not asserted unless the publisher confirms them."
    },
    "dimensions": [
      {
        "key": "indexing",
        "label": "Indexing",
        "question": "May the item be indexed (stored, ranked, made findable)?",
        "permission": "allowed",
        "permissionLabel": "Allowed"
      },
      {
        "key": "snippet",
        "label": "Snippet",
        "question": "May a short excerpt of the publisher's text be shown?",
        "permission": "allowed",
        "permissionLabel": "Allowed"
      },
      {
        "key": "summary",
        "label": "AI summary",
        "question": "May WeSearch generate its own short summary of the article?",
        "permission": "limited",
        "permissionLabel": "Limited"
      },
      {
        "key": "retrieval",
        "label": "Retrieval / RAG",
        "question": "May the content be exposed for third-party retrieval-augmented generation?",
        "permission": "not-asserted",
        "permissionLabel": "Not asserted"
      },
      {
        "key": "training",
        "label": "Model training",
        "question": "May the content be used to train AI models?",
        "permission": "not-asserted",
        "permissionLabel": "Not asserted"
      },
      {
        "key": "commercialReuse",
        "label": "Commercial reuse",
        "question": "May the content be reused commercially?",
        "permission": "denied",
        "permissionLabel": "Not permitted"
      }
    ],
    "attribution": "Headline + short excerpt shown with the publisher's name and a canonical link back to the original article.",
    "licensingContact": "bryanleonard@imagineqira.com",
    "lastVerified": "2026-07-24",
    "inspectUrl": "https://wesearch.press/rights/source/ft-home"
  },
  "linkOut": {
    "publisherReceivesVisit": true,
    "wesearchSubstitutesArticle": false,
    "originalUrl": "https://www.ft.com/content/d5adde7e-68cc-455b-ba78-b39cc3676b7a?syn-25a6b1a6=1"
  },
  "cluster": {
    "clusterId": "5fHLDRbkHaLY",
    "storyCount": 1,
    "logic": "Grouped by semantic title/content similarity across sources within a rolling window. Same-publisher template collisions are excluded from coverage comparison."
  },
  "ranking": {
    "reason": "Story pages are not engagement-ranked. Hub feeds use recency, with optional source-diversified chronological ordering (cap consecutive stories per source). No personalized ranking.",
    "personalized": false,
    "engagementRanked": false
  },
  "corrections": [],
  "generatedAt": "2026-11-16T08:21:29.959Z"
}