{
  "schema": "WESEARCH-STORY-PROVENANCE-V1",
  "storySlug": "texas-has-suspended-17-data-center-construction-permits-and-793051a8",
  "originalPublisher": "Tom's Hardware",
  "canonicalUrl": "https://www.tomshardware.com/tech-industry/data-centers/texas-has-suspended-17-data-center-construction-permits-and-shut-down-automated-portal-used-to-approve-them-site-was-left-running-for-a-month-after-greg-abbott-called-for-a-pause-on-approvals",
  "wesearchUrl": "https://wesearch.press/s/texas-has-suspended-17-data-center-construction-permits-and-793051a8",
  "publicationTime": "Sat, 24 Oct 2026 11:35:00 +0000",
  "retrievalTime": "2026-10-24T11:43:04.268Z",
  "lastSeenTime": "2026-10-24T11:43:04.268Z",
  "headline": {
    "displayed": " Texas has suspended 17 data center construction permits and shut down automated portal that rubber-stamped projects  ",
    "source": "publisher",
    "modifications": [
      "Displayed as received from the publisher feed or extract; WeSearch does not rewrite headlines."
    ]
  },
  "excerpt": {
    "present": false,
    "source": "none",
    "method": "No excerpt available.",
    "charLimit": 800
  },
  "summary": {
    "present": false,
    "producedBy": "none",
    "model": null,
    "sourceText": "none",
    "citationCoverage": "No WeSearch summary has been generated for this story yet."
  },
  "rights": {
    "sourceId": "tomshardware",
    "feedTitle": "Tom's Hardware",
    "basis": "rss-default",
    "basisLabel": "Derived from the published RSS/Atom feed",
    "layers": {
      "publisher-declared": "No publisher-confirmed rights record for this source yet.",
      "machine-readable-detected": "No source-specific machine-readable restriction detected beyond the public feed.",
      "wesearch-interpretation": "WeSearch declared handling (basis: Derived from the published RSS/Atom feed). This is WeSearch policy, not a legal grant on the publisher's behalf.",
      "unknown": "Retrieval and training permissions are not asserted unless the publisher confirms them."
    },
    "dimensions": [
      {
        "key": "indexing",
        "label": "Indexing",
        "question": "May the item be indexed (stored, ranked, made findable)?",
        "permission": "allowed",
        "permissionLabel": "Allowed"
      },
      {
        "key": "snippet",
        "label": "Snippet",
        "question": "May a short excerpt of the publisher's text be shown?",
        "permission": "allowed",
        "permissionLabel": "Allowed"
      },
      {
        "key": "summary",
        "label": "AI summary",
        "question": "May WeSearch generate its own short summary of the article?",
        "permission": "limited",
        "permissionLabel": "Limited"
      },
      {
        "key": "retrieval",
        "label": "Retrieval / RAG",
        "question": "May the content be exposed for third-party retrieval-augmented generation?",
        "permission": "not-asserted",
        "permissionLabel": "Not asserted"
      },
      {
        "key": "training",
        "label": "Model training",
        "question": "May the content be used to train AI models?",
        "permission": "not-asserted",
        "permissionLabel": "Not asserted"
      },
      {
        "key": "commercialReuse",
        "label": "Commercial reuse",
        "question": "May the content be reused commercially?",
        "permission": "denied",
        "permissionLabel": "Not permitted"
      }
    ],
    "attribution": "Headline + short excerpt shown with the publisher's name and a canonical link back to the original article.",
    "licensingContact": "bryanleonard@imagineqira.com",
    "lastVerified": "2026-07-24",
    "inspectUrl": "https://wesearch.press/rights/source/tomshardware"
  },
  "linkOut": {
    "publisherReceivesVisit": true,
    "wesearchSubstitutesArticle": false,
    "originalUrl": "https://www.tomshardware.com/tech-industry/data-centers/texas-has-suspended-17-data-center-construction-permits-and-shut-down-automated-portal-used-to-approve-them-site-was-left-running-for-a-month-after-greg-abbott-called-for-a-pause-on-approvals"
  },
  "cluster": {
    "clusterId": "7slV75qkW5Ro",
    "storyCount": 1,
    "logic": "Grouped by semantic title/content similarity across sources within a rolling window. Same-publisher template collisions are excluded from coverage comparison."
  },
  "ranking": {
    "reason": "Story pages are not engagement-ranked. Hub feeds use recency, with optional source-diversified chronological ordering (cap consecutive stories per source). No personalized ranking.",
    "personalized": false,
    "engagementRanked": false
  },
  "corrections": [],
  "generatedAt": "2026-10-24T13:57:20.712Z"
}