
UK wants more homes heated by waste heat from datacenters
REG AD googletag.cmd.push(function() { googletag.display('labrador/thereg/article/desktop/b'); }); The Register reported on a project back in 2023 that planned to connect 10,000 new homes in west London with nearby server farms to use their waste energy for heating. REG AD googletag.cmd.push(function() { googletag.display('labrador/thereg/article/desktop/c'); }); Given the glacial pace of progress on any UK project these days, the first question must be when this is likely to happen. There is currently no information on how much that potion of the project will cost.There is also the question of whether using the waste heat from datacenters is really that efficient.
- ▪REG AD googletag.cmd.push(function() { googletag.display('labrador/thereg/article/desktop/b'); }); The Register reported on a project back in 2023 that planned to connect 10,000 new homes in west London with nearby server farms to use their
- ▪REG AD googletag.cmd.push(function() { googletag.display('labrador/thereg/article/desktop/c'); }); Given the glacial pace of progress on any UK project these days, the first question must be when this is likely to happen.
- ▪There is currently no information on how much that potion of the project will cost.There is also the question of whether using the waste heat from datacenters is really that efficient.
The Register publishes from United Kingdom and files mainly under tech. We currently carry 707 of its stories.
Story provenance
Source · retrieval · rights · ranking — open for full record
inspect →
Story provenance
Attribution is not the same as permission. This drawer separates discovery metadata, excerpts, WeSearch-generated summaries, reuse status, and whether the publisher receives the visit. Nothing here claims a legal grant the publisher has not made.
Record
| Original publisher | The Register |
| Canonical URL | https://www.theregister.com/on-prem/2026/09/25/uk-wants-more-homes-heated-by-waste-heat-from-datacenters/5298827 |
| Publication time | Fri, 25 Sep 2026 10:30:00 +0200 |
| Retrieval time | 2026-09-25T08:30:32.568Z |
| Last seen | 2026-09-25T08:30:32.568Z |
| Headline source | Publisher (no WeSearch rewrite) |
| Excerpt source | publisher body |
| Excerpt method | First ~120 words (~800 chars) of extracted publisher body, fair-use limited. |
| Summary | WeSearch · cerebras-chat (WeSearch summarizer) |
| Summary source text | contentText |
| Citation coverage | Summary is a WeSearch-generated derivative; primary citation is the original publisher URL. |
| Cluster | NET6KdcCYpyp · 1 stories |
| Cluster logic | Grouped by semantic title/content similarity across sources within a rolling window. Same-publisher template collisions are excluded from coverage comparison. |
| Ranking reason | Story pages are not engagement-ranked. Hub feeds use recency, with optional source-diversified chronological ordering (cap consecutive stories per source). No personalized ranking. |
| Publisher visit | Yes — open original |
| Substitutes article? | No — link-out required for full text |
Rights status (four layers)
WeSearch handling by dimension
| Indexing | May the item be indexed (stored, ranked, made findable)? | Allowed |
| Snippet | May a short excerpt of the publisher's text be shown? | Allowed |
| AI summary | May WeSearch generate its own short summary of the article? | Limited |
| Retrieval / RAG | May the content be exposed for third-party retrieval-augmented generation? | Not asserted |
| Model training | May the content be used to train AI models? | Not asserted |
| Commercial reuse | May the content be reused commercially? | Not permitted |
Basis: Derived from the published RSS/Atom feed. Contact: [email protected]. Reviewed: 2026-07-24.
Opening excerpt (first ~120 words) tap to expand
(function() { let windowUrl = window.location.href; windowUrl = windowUrl.substring(windowUrl.indexOf('?') + 1); let messageElement = document.querySelector('.shareableMessage'); if (windowUrl && windowUrl.includes('code') && windowUrl.includes('expires')) { messageElement.style.display = 'block'; } })(); on-prem UK wants more homes heated by waste heat from datacenters Millions for building and improving bitbarn driven heat networks - including hot water pushed through tunnel under the Thames Dan Robinson Dan Robinson IT INFRASTRUCTURE REPORTER Published fri 25 Sep 2026 // 09:30 UTC READ MORE The more Americans hear about datacenters, the less they like them 1 day ago America is building datacenters faster than the grid can power them 9 days ago Datacenter developers want your backyard.
…
Excerpt limited to ~120 words for fair-use compliance. The full article is at The Register.